    High-rise construction in Dubai and Abu Dhabi demands formwork that keeps pace with 4-day slab cycles and delivers finish quality on every floor.

    Slab-table and flying-form systems

    Dubai high-rise towers often use slab-table or flying-form systems that climb with the core. The plywood faces on these steel tables see 60-100+ reuses over the programme. Only high-density hardwood-core WBP panels with 220 g/m² film survive this duty cycle without delamination or excessive wear.

    Core wall and shear wall shutters

    Core walls in high-rise towers pour in 3-4 metre lifts with tight dimensional tolerances. Film-faced plywood on steel-framed shutters must stay flat under concrete pressure and resist the abrasion of repeated stripping and re-fixing. 18mm panels with eucalyptus or keruing core are the UAE consultant standard.

    Logistics and vertical transport

    On towers above 30 storeys, plywood is craned in bundles to the active floor. Lightweight poplar-core sheets reduce crane time but wear faster; many UAE contractors now standardise on combi core as the sweet spot between weight and durability. TIC Dubai supplies both and can phase deliveries floor-by-floor to reduce site congestion.

    Finish quality on exposed soffits

    High-end residential and hotel towers in Dubai increasingly leave concrete soffits exposed as a design feature. This demands film-faced plywood that releases cleanly, leaving no fibre pull or stain. Superform-grade panels with 240 g/m² film and controlled veneer quality are specified on these architectural pours.

    Frequently asked questions

    What plywood grade is standard on Dubai high-rise slabs?
    WBP 18mm hardwood or combi core with 220 g/m² phenolic film is the typical specification for standard high-rise slab work.
    How many slab pours can one panel survive?
    On well-managed slab tables with prompt cleaning, 40-60 pours from premium hardwood-core panels; 25-35 from combi core.
    Can you deliver floor-by-floor to a Dubai tower site?
    Yes, TIC Dubai coordinates phased deliveries to active floors or podium storage to match the contractor's climb schedule.